France triples planned renewable energy auction volume to 1.5 GW
France is tripling the capacity of its upcoming renewable energy tender from 500 MW to 1.5 GW. According to the government, the auction will be open to all technologies and will introduce a single baseload reference price, shifting how producers are paid.

Original image temporarily unavailable
The French government announced during a press briefing on Nov. 25 that it is scaling up its upcoming technology-neutral renewable energy auction from the initially proposed 500 MW to 1.5 GW, following pushback and concerns raised by industry associations. The upcoming tender will incorporate various renewable power generation technologies.
Another significant modification is the shift in how the reference price is calculated. Instead of using technology-specific generation profiles—such as the bell-shaped curve tracking midday solar peaks—the new rules introduce a single M0 baseload reference price. This approach relies on the national monthly average of wholesale spot electricity prices across all hours of the day. By adopting this method, French renewable producers will face greater exposure to wholesale market price fluctuations rather than benefiting from their specific generation curves.
View selection rationale
Importance 70/100
About this brief
- Content type
- News summary
- Source type
- Publisher report
- Original source
- pv magazine Global ↗
- Source published
- Process
- AI-assisted discovery, translation, summarisation, classification and scoring; standards and corrections are maintained by the editorial desk.
- Verification
- The original URL and publication metadata are retained. This brief is not independently fact-checked unless explicitly stated.
- Published by
- Polyemergence Editorial Desk
- Conflict disclosure
- No financial or commercial conflict declared.
